top of page

Hyland Creek Estates

Drainage Remediation Works

6601 138 Street, Surrey, BC

All Round Restorations Ltd. addressed several key issues around the building, including improving drainage by installing perforated drain lines, area drains, and regrading areas to create a 2% slope, ensuring water flows away from the foundation and preventing pooling, erosion, and foundation damage. The work also involves restoring disturbed lawn areas with hydroseeding, re-installing paving stones, and adding a new concrete walkway to fix damaged and uneven hardscaping.

© All Round Home Improvements and Restorations Ltd. 2025. All Rights Reserved.

bottom of page